Project for Planning Capacity Enhancement and Establishment of a Technology Adaptation Cycle on Comprehensive River Management
- Client
- Japan International Cooperation Agency (JICA), Bangladesh Water Development Board (BWDB)
- Location
- Jamuna River, Sangu River and Matamuhuri River
- Duration
- Ongoing since 2022
- Associated consultants
- Oriental Consultants Global Co. Ltd, Pacific Consultants Co., Ltd.
The project aims to develop systematic river management methods suited to Bangladesh's diverse rivers. It focuses on major rivers like the Jamuna, and smaller rivers in the southeast, while enhancing BWDB staff capacity through knowledge tools and management plans. By tackling riverbank erosion, sedimentation, and channel shifting, the project supports sustainable river management in line with Bangladesh’s Delta Plan 2100 and the SDGs.
Services provided
- Baseline Study
- Socio-economic Study
- River Migration Analysis
- Hydrological Data Collection and Analysis
- Drone Survey
- Multibeam Echo Sounder Survey, Side Scan Sonar Survey, and Sub-bottom Profiler Survey
- FGD and Questionnaire Survey
- Stakeholders Meetings
- Development of Database System